Client | taz – Die Tageszeitung – Verlagsgenossenschaft |
Architecture | e2a Piet Eckert and Wim Eckert |
Structural Engineering | Schnetzer Puskas International / GuD Planungsgesellschaft für Ingenieurbau mbH |
Planning | 2014-2016 |
Realization | 2016-2018 |
Status | Built |
A load-bearing structure that is cooperative in nature for a coop client—taz, a media cooperative based in Berlin, received a new building whose structural system is rooted in the cooperative philosophy. Rigid triangles create stable load-bearing systems in which the internal forces are efficiently reduced to tension and compression. Ideally, bending, shear, and torsional forces are absent and therefore do not need to be considered in the calculations. This has the advantage of maximizing stability while simultaneously minimizing the use of material, resulting in a low dead weight.
The new building essentially comprises two basement levels, a ground floor, and six upper floors that are basically geometrically identical. The seventh story is taller than the others, but this does not affect the fundamental load flow, because only the legs of the triangle are lengthened while the load-bearing principle remains the same—namely, that the triangle absorbs both vertical and horizontal forces in the facade planes and forms a stable load-bearing structure through its friction-locked connection to the floor slabs. The same also applies to the double-story spatial volumes on the ground and second floors. The triangular geometry can also compensate for force-flow-specific irregularities by redirecting them. This robust structural system is optimal even for foundation soil’s low bearing capacity, because it can equalize peak loads. This principle helps to create a load-bearing system that functions like a mesh that covers the seven-story building and transmits all the occurring forces. No additional bracing is needed. The vertical load is transferred entirely by the diagonal members, which take the form of prefabricated reinforced concrete columns and also provide the horizontal bracing, in conjunction with the horizontal ends of the prestressed ribbed slabs. As a result, the press landscape can be flexibly occupied like a loft with wide spans and no vertical elements. The building can accommodate any change of use because the load-bearing structure causes no disruption.
In this respect, the taz headquarters building is reminiscent of Vladimir G. Shukhov’s Shabolovka radio tower in Moscow from the early 1920s. Its structure, configured as a mesh, achieved maximum load-bearing capacity with a minimum of material. The radio tower is another symbol of a load-bearing system in which all the elements must perform equally and only achieve stability by working together. A system without hierarchy. The architectural expression of the taz’s new home is thus both a structure for and a symbol of the organization.
Ansicht des zweigeschossigen Innenraums im Rohzustand
Rory Gardiner
Redaktions -und Konferenzraum
Rory Gardiner
Blick vom taz.Panorama
Rory Gardiner
2. OG, Grossraumbüro, Blick zum Besselpark
Rasmus Norlanden
Visualisierung der wesentlichen Teile der Tragstruktur: Nur Erschliessungskerne und Wände (links); inklusive vorgespannte Rippendecken (Mitte); inklusive vorgespannte Randträger und diagonale Stützen (rechts).
Schnetzer Puskas Ingenieure
Links: Normalkräfte infolge Lastabtrag der vertikalen Stockwerkslasten
Rechts: Normalkräfte aufgrund horizontaler Beanspruchung (Wind)
Schnetzer Puskas Ingenieure
Decken-/Bodenanschluss zweier Stützen
Schnetzer Puskas Ingenieure
Querschnitte durch den Decken-Randbereich und durch ein vorfabriziertes Decken-Rippenelement
Schnetzer Puskas Ingenieure
Vorspannplan des Erdgeschosses bis zum 3. Obergeschoss der Fassade Nord
Schnetzer Puskas Ingenieure
Ansichten der Ausstellung "Schnetzer Puskas Ingenieure. Balanced Structures" an der Architektur Galerie Berlin, 5. September - 12. Oktober 2024
Jan Bitter
Client | taz – Die Tageszeitung – Verlagsgenossenschaft |
Architecture | e2a Piet Eckert and Wim Eckert |
Structural Engineering | Schnetzer Puskas International / GuD Planungsgesellschaft für Ingenieurbau mbH |
Planning | 2014-2016 |
Realization | 2016-2018 |
Status | Built |